Outstanding Progress made on Concentrator Engineering Study
Released
Released
Announcement PDF
Building a Lithium Future
ASX ANNOUNCEMENT AND MEDIA RELEASE
28 November 2023
OUTSTANDING PROGRESS ON QLPH
CONCENTRATOR ENGINEERING STUDY
Highlights
Primero's outstanding progress in QLPH concentrator engineering study
Impressive pace and quality surpasses industry norms
Design: 4-stage crushing, DMS and flotation unit with mica removal
Based on Mt Cattlin design and supervised by Lithium Dream Team
Key deliverables: Block Flow & Process Flow Diagrams, Mass Balance, Process Design
Criteria
• Initiating Piping & Instrument Diagrams, datasheets for vendor pricing
•
•
•
•
•
Lithium Universe Limited (“Lithium Universe”, the “Company” or ASX: “LU7”) is pleased to report the
outstanding progress made in the Engineering Study by Primero Group Limited (Primero) on the Company’s
Québec Lithium Processing Hub (QLPH) stand-alone multi-purpose concentrator. The Concentrator is rated at
a 1 Mtpa processing rate with an assumed feed grade of 1.1% Li2O. The output is expected to be around
140,000 tpa of spodumene concentrate at a grade of around 5.5% Li2O to maximise recoveries.
The finalized design flow sheet outlines a four-stage crushing process to generate crushed ore ranging from
0.85mm to 6mm in size. Any crusher fines smaller than 0.85mm identified by the screens will undergo processing
in a dedicated flotation unit. The spodumene recovered from this process will filtered and blended with the final
spodumene concentrate. Additionally, any mica present in the crushed ore will undergo removal using a reflux
classifier. Subsequently, the material will be split into two streams: one less than 3mm and the other greater
than 3mm. Both streams will be directed through two-stage dense media separation units. The less than 3mm
stream will undergo mica removal via a reflux classifier at the initial stage. The recovered spodumene from both
streams will be combined through blending and stored in a dedicated storage shed. To ensure functionality in
the Québec climate, the entire plant will be winterized. See Figure 1 for final flow sheet.
The design closely resembles that of the Mt Cattlin plant, except for the inclusion of the flotation unit. This
addition aims to create a more resilient plant capable of processing various types of ore from the James Bay,
Québec region, enhancing its capacity to handle a broader range of ore types and ensuring robustness in
operations.
Lithium Universe Limited
ASX:LU7
ABN 22 148 878 782
Suite 9, 295 Rokeby Road,
Subiaco, WA 6008,
Australia
Telephone: +61 02 8046 2799
Website: www.lithiumuniverse.com
Investor Hub: investorhub.lithiumuniverse
Ore Sorter
1.0 Mtpa
Ore Haulage
ROM
3 Stage
Crusher
-20mm
Heavy Media
Separation
>3mm
Mica
Removal
Crushed
Ore Bin
4th Stage
Crusher
1o
Screening
-6mm
Heavy Media
Attritioner
Separation
+0.85mm
Waste
Waste
1o Spodumene
Reflux
Classifier
Recovery
<3mm
Heavy Media
Separation
-0.5mm
2o Spodumene
Recovery
Attritioner
Thickener
Ball Mill
Waste
Waste
Product Filter
Spodumene
Product
140,000 tpa
5.5% Li2O
Flotation
Dry Stacking
Tails
QLPH
Li Refinery
Figure 1 – QLPH Concentrator Flow Sheet
So far, the Primero Study team has provided a Block Flow Diagram (BFD) and Process Flow Diagrams (PFD).
They've also delivered a Mass Balance along with Process Design Criteria (PDC), which showcase mass flows,
splits, and anticipated tonnages concerning significant equipment. The team has initiated work on the Piping
and Instrumentation Diagrams (P&IDs) to present a more intricate layout of equipment, process streams,
instrumentation, and control logic. Leveraging the information derived from the Mass Balance and PDC, Primero
has begun generating datasheets. These datasheets will serve to gather pricing details from vendors, facilitating
the procurement process. The progress made thus far has been excellent, and the current status includes:
Table 1 – Deliverables status from Primero
Deliverables
Block Flow Diagrams
Process Flow Diagrams
Process Design Criteria
Mass Balance
Percent Complete
95%
85%
80%
80%
Table 2 – Detailed deliverables status from Primero
Deliverables
Mechanical Equipment List
Datasheets
Shope Detailing Sepcification
Packaging and Shipping Specification
Surface Protection Specification
Rubber Lining Specification
General Mechanical Specification
Platework Specification
Piping Fabrication Specification
Piping material and valves Specification
Plant Numbering
Line List
Valve List
Special Items List
Platework MTO
Lithium Universe Limited
ASX:LU7
ABN 22 148 878 782
Percent Complete
Suite 9, 295 Rokeby Road,
Subiaco, WA 6008,
Australia
50%
30%
70%
70%
70%
60%
70%
70%
70%
85%
30%
30%
30%
25%
Telephone: +61 02 8046 2799
Website: www.lithiumuniverse.com
Investor Hub: investorhub.lithiumuniverse
Mr Iggy Tan, the Chairman of LU7 said “The engineering study's progress for the QLPH stand-alone concentrator
by Primero has been exceptional, setting the stage for the Definitive Feasibility Study (DFS). Considering our
listing in early August this year, the pace and quality of work demonstrated by Primero, guided by the Company's
Lithium Dream Team, has been truly remarkable. Most companies conducting a study of this calibre typically
take at least six to nine months to reach this point. Looking ahead, finalizing equipment specifications and data
sheets represents the next step, enabling us to approach suppliers for concrete pricing. The ongoing progress
and achievements continue to impress us”.
Authorisation
-Ends-
This announcement had been authorised for release by Iggy Tan, Chairman of Lithium Universe Limited.
For more information, please contact:
Alex Hanly
Chief Executive Officer
Lithium Universe Limited
Email: info@lithiumuniverse.com
Iggy Tan
Chairman
Lithium Universe Limited
Email: info@lithiumuniverse.com
Lithium Universe Interactive Investor Hub
Engage with Lithium Universe directly by asking questions, watching video summaries and seeing what other
shareholders have to say about this, as well as past announcements, at our Investor Hub
https://investorhub.lithiumuniverse.com/
Forward-looking Statements
The Company wishes to remind investors that the presence of pegmatite does not necessarily equate to spodumene mineralization. Also that the
presence of pegmatite and spodumene mineralization on nearby tenements does not necessarily equate to the occurrence on Lithium Universe
Limited’s tenements. This announcement contains forward-looking statements which are identified by words such as ‘anticipates’, ‘forecasts’, ‘may’,
‘will’, ‘could’, ‘believes’, ‘estimates’, ‘targets’, ‘expects’, ‘plan’ or ‘intends’ and other similar words that involve risks and uncertainties. Indications of,
and guidelines or outlook on, future earnings, distributions or financial position or performance and targets, estimates and assumptions in respect of
production, prices, operating costs, results, capital expenditures, reserves and resources are also forward looking statements. These statements are
based on an assessment of present economic and operating conditions, and on a number of assumptions and estimates regarding future events and
actions that, while considered reasonable as at the date of this announcement and are expected to take place, are inherently subject to significant
technical, business, economic, competitive, political and social uncertainties and contingencies. Such forward-looking statements are not guarantees
of future performance and involve known and unknown risks, uncertainties, assumptions and other important factors, many of which are beyond the
control of our Company, the Directors and management. We cannot and do not give any assurance that the results, performance or achievements
expressed or implied by the forward-looking statements contained in this announcement will actually occur and readers are cautioned not to place
undue reliance on these forward-looking statements. These forward looking statements are subject to various risk factors that could cause actual
events or results to differ materially from the events or results estimated, expressed or anticipated in these statements.
Lithium Universe Limited
ASX:LU7
ABN 22 148 878 782
Suite 9, 295 Rokeby Road,
Subiaco, WA 6008,
Australia
Telephone: +61 02 8046 2799
Website: www.lithiumuniverse.com
Investor Hub: investorhub.lithiumuniverse
About Lithium Universe Limited (ASX:LU7)
LU7's main objective is to establish itself as a prominent Lithium project builder by prioritizing swift and successful development of Lithium projects.
Instead of exploring for the sake of exploration, LU7's mission is to quickly obtain a resource and construct a spodumene-producing mine in Québec,
Canada. Unlike many other Lithium exploration companies, LU7 possesses the essential expertise and skill to develop and construct profitable
projects. Additionally, Lithium Universe Limited has access to significant Lithium opportunities in Tier 1 mining jurisdictions in Canada and Australia.
Tier 1 Lithium Inventory
Apollo Lithium Project (80%)
Commanding a land position spanning over 240 km2, Apollo is located in the same greenstone belt and only 29 kilometres south-east of the Corvette
Lithium Project owned by Patriot Battery Metals (market cap of over A$1.4 billion). Patriot's most successful drill result was a remarkable 156 meters
at 2.12% Li2O at CV5. Similarly, 28 kilometres to the east, Winsome Resources Limited (market capitalization of over A$300 million) recently
announced drilling hits of 107 meters at 1.34% Li2O from 2.3 meters (AD-22-005) at their Adina Project. Apollo has 17 pegmatite outcrops reported
on the tenement package. Given the exceptional results from these neighbouring projects, the Apollo Lithium Project has the potential to be equally
successful.
Adina South & Adina West Lithium Project (80%)
The project is situated in close proximity to the Adina discovery, which is owned by Winsome Resources, a Company with a Market Capitalisation
of over A$300m in the market. The Adina Project has produced a visual pegmatite intersection of over 160m in drills, lying beneath outcropping
4.89% Li2O. Recently, Winsome Resources reported successful drilling results, with AD-22-005 yielding 107m at 1.34% Li2O from 2.3m at their
Adina Project. The Adina South & Adina West Lithium Project boasts one of the largest prospective land holdings near Winsome Resources Limited.
Aerial satellite images have revealed similar pegmatite occurrences at the surface.
Margot Lake Lithium Project (80%)
The Margot Lake project is located in north-western Ontario, in the premium lithium mineral district of Ontario’s Great Lakes region. The project is
situated 16km southeast of Frontier Lithium’s (TSX-V: FL) PAK Deposit, which contains 9.3Mt at 2.0% Li2O, and 18km away from Frontier’s Spark
Deposit, which contains 32.5Mt at 1.4% Li2O. The tenement contains nine confirmed and mapped pegmatites and is located in a highly competitive
district due to recent major discoveries of lithium. Frontier Lithium, with a market capitalization more than CAD$450 million, is a significant player in
the region.
Lefroy Lithium Project (100%)
Lefroy is in the mineral-rich Goldfields region of Western Australia. This strategically located project is in close proximity to the Bald Hill Lithium
Mine, which has a top-quality spodumene concentrate with low levels of mica and iron, as well as significant tantalum by-product production. The
Bald Hill mine has a resource of 26.5 million tonnes at 1.00% Li2O. The Lefroy project is also located near the Mt. Marion Lithium Mine, which is
owned by Mineral Resources and has a market capitalization of A$17B. Mt. Marion produces 900,000 tonnes of mixed-grade spodumene
concentrate annually and is approximately 60 kilometres from the Lefroy project.
Voyager Rare Earth Project (80%)
The Voyager project is north tenements are positioned between ABx Group tenures, where clay-hosted rare earth elements (REE) and niobium
have been discovered and hold resources of 27Mt. These areas are analogous with Ionic Adsorption Clay (IAC) deposits that have produced REE in
southern China using simple leaching. ABx stated that early testwork indications show their rare earth elements are easily leached and could be
concentrated at low cost, with no deleterious elements. Geological mapping of Voyager's tenures indicates the presence of various areas of clay
and bauxite, which is the ideal geological environment for the occurrence of rare earth elements.
Lithium Universe Limited
ASX:LU7
ABN 22 148 878 782
Suite 9, 295 Rokeby Road,
Subiaco, WA 6008,
Australia
Telephone: +61 02 8046 2799
Website: www.lithiumuniverse.com
Investor Hub: investorhub.lithiumuniverse
Share your feedback
Discover