Quarterly Activities/Appendix 5B Cash Flow Report
DECEMBER 2024
QUARTERLY
REPORT
HIGHLIGHTS
Strong Preliminary Feasibility for Bécancour
Lithium Refinery
The Location
The Lithium Universe Strategy
•
•
•
•
•
Positive, robust Bécancour Refinery PFS even in low
pricing environment
LU7 has a counter cyclical strategy – develop project,
ready for price recovery
Closing the Lithium Conversion Gap – growth in
resource and end market projects
The Financial Modelling
•
•
•
•
•
•
Economically viable with excellent pre-tax NPV8% of
approximately US$779M
IRR (pre-tax) of approximately 23.5% and payback of
3.5 years based on;
Price forecast of US$1,170/t SC6 and US$20,970/t
for battery grade Li2CO3
Operating costs at around US$3,976/tonne; capital
cost estimate of US$494 million
Expected annual revenue of approx US$383 million
and EBITDA of around US$147 million
Project break even at around US$780 /t (SC6) and
around US$14,000 per tonne Li2CO3
The Design
•
•
•
•
•
•
LU7 offers a solution to worldwide lithium conversion
failures and startup problems
Using proven Jiangsu Refinery operating technology
and lithium industry experience
Producing up to 18,270 tonnes/year of green batterygrade lithium carbonate
Smaller off-the-shelf style plant rather than large
difficult-to-operate facilities
Initial focus on lithium carbonate production – feed
for LFP batteries
Assumptions based on real operating data and
experience – not new aspirant
•
•
Québec ideal trans-Atlantic lithium conversion centre,
comparable to China
Feedstock from Canada, Brazil and Africa – end
market North America
Critical cost benefits – cheap green power, transport
mine/end market savings, US/Canada tariffs
95% GHG emission reduction with Hydro Québec’s
green energy
Next Steps
•
•
Offtake discussions with interested OEMs underway
LU7 continues to progress full Definitive Feasibility
Study
LU7 Bécancour Lithium Refinery Definitive
Feasibility Study On Track To Be Released
Next Quarter
•
•
•
•
•
•
•
DFS is progressing and on track as expected
Finalizing capital cost estimate for DFS
80% of supplier pricing program completed
Procurement strategy and material take-offs being
finalized
Engineering design tailored to new site conditions
Project led by John Loxton, Head of Refinery
Overseen by Lithium expert, Dr Jingyuan Liu (NED)
LU7 Partners With Quebec Chemical Logistics
Supply Company
•
•
•
•
•
Strategic local chemical logistics partnership with
Servitank
Single logistics supplier capable of sourcing multiple
process chemicals
Reliable delivery of critical chemical inputs to
Bécancour Lithium Refinery
Investigation of secondary product management and
sales
Proven experience in spodumene logistics and
storage
Lithium Universe Limited | Quarterly Report | 1
Lithium Universe Limited | ASX: LU7
(NPV)
of approximately
US$779
million, using an 8%
Strong Preliminary
Feasibility
ForLimited
Bécancour
Lithium
Universe
I Quarterly
Report
I September
2024
discount
rate,
and
a
pre-tax
Internal
Rate of Return (IRR)
Lithium Refinery
Lithium Universe Limited recently announced the
Strong
Preliminary
for Bécancour
results
of its
PreliminaryFeasibility
Feasibility Study
(PFS) for
Lithium
Refinery
the Bécancour Lithium Carbonate Refinery in Québec,
LithiumThe
Universe
recently
announced
results
of its
Canada.
PFS Limited
confirms
the viability
of a the
strong
lithium
Preliminary
Feasibility
Study
(PFS)
for
the
Bécancour
Lithium
conversion project, even within a below-average pricing
Carbonate Refinery
in Québec,
Canada.
The PFS
confirmslowthe
environment.
The Company
plans
to build
a reliable,
a strong lithium conversion project, even within a
riskviability
lithiumof conversion
refinery with an annual capacity
below-average pricing environment. The Company plans to
of up to 18,270 tonnes, utilizing proven expertise from
build a reliable, low-risk lithium conversion refinery with an
the Jiangsu processing model. The facility will produce
annual capacity of up to 18,270 tonnes, utilizing proven
environmentally
friendly,
battery-grade
lithium
carbonate.
expertise from the
Jiangsu
processing model.
The
facility will
Theproduce
Company
aims
to
establish
a
Canadian-based
environmentally friendly, battery-grade lithium
lithium
chemicals
business,
purchasing
spodumene
feedstock
carbonate. The Company
aims to establish
a Canadian-based
from
bothchemicals
domesticbusiness,
suppliers
and international
lithium
purchasing
spodumene markets,
feedstock
including
Brazil
and
Africa
and
producing
a
battery
grade
from both domestic suppliers and international markets,
lithium
carbonate
with the
Company’s
including
Brazil product.
and AfricaThis
andaligns
producing
a battery
grade
lithiumvision
carbonate
product. This
aligns
withAtlantic
the Company's
broader
of contributing
to the
North
lithium
broader
vision
contributing
to the Conversion
North Atlantic
lithium
supply
chain
andofclosing
the Lithium
Gap.
supply chain and closing the Lithium Conversion Gap.
The project’s economics are highly favourable, even
project's economics
are highly favourable,
even with
withTheconservative
price assumptions.
The refinery
is
conservative
price
assumptions.
The
refinery
is
economically
economically viable with a pre-tax Net Present Value
viable with a pre-tax Net Present Value (NPV) of approximately
of around 23.5%. The payback period is estimated at 3.5
years. The financial model is built on cautious price forecasts
US$779
million, per
using tonne
an 8% for
discount
rate, and concentrate
a pre-tax
of
US$1,170
spodumene
Internaland
RateUS$20,970
of Return (IRR)
around
The payback
(SC6)
per oftonne
for23.5%.
battery-grade
lithium
period is estimated
at 3.5(LCE).
years. The
financial
modelbelieve
is built onthey
carbonate
equivalent
LU7’s
directors
cautious
price forecastsbasis
of US$1,170
per tonne
for spodumene
have
a reasonable
for using
the assumed
price in
concentrate
(SC6)
and
US$20,970
per
tonne
for
battery-grade
the study of US$20,970 per tonne for battery grade lithium
lithium carbonate
equivalent (LCE).
LU7's directors
believe
carbonate.
Key operational
assumptions
include 86%
plant
they have a reasonable basis for using the assumed price in
availability and 88% lithium recovery. At full production
the study of US$20,970 per tonne for battery grade lithium
capacity, the project is expected to generate approximately
carbonate. Key operational assumptions include 86% plant
US$383
million in annual revenue, with costs totalling
availability and 88% lithium recovery. At full production
around
million,
leading
an annual
EBITDA of
is expected
to to
generate
approximately
capacity,US$236
the project
approximately
US$147
million
and
a
gross
margin
US$383 million in annual revenue, with costs totalling aroundof in
the
region
of 38%.
theEBITDA
NPV atof approximately
an 8% discount
US$236
million,
leadingPost-tax,
to an annual
rate
is
estimated
at
approximately
US$501
US$147 million and a gross margin of in the regionmillion.
of 38%.The
capital
theatproject
estimated
Post-tax,cost
the for
NPV
an 8%isdiscount
rateatisUS$494
estimatedmillion,
at
which
includesUS$501
a contingency
of capital
US$68cost
million.
capital
approximately
million. The
for theThe
project
is estimated
at US$494
which includes
a contingency
cost
estimate
is basedmillion,
on advanced
design
specifications
of US$68
million. Lithium
The capital
cost estimate
is based robust
on
from
the Jiangsu
Refinery
model, ensuring
advancedplanning
design specifications
from
the factors
Jiangsuhighlight
Lithium the
financial
and projection.
These
Refinery strong
model, financial
ensuring viability,
robust financial
planning
and
project’s
even under
conservative
projection.
These factors highlight the project's strong financial
pricing
conditions.
viability, even under conservative pricing conditions.
7000
100,000
6000
85,000
Price (USD$ / tonne)
Price (USD$ / tonne)
Figure 1: Lithium Universe Bécancour Refinery Estimated Pre-tax Cashflows
5000
4000
3000
1000
1000
70,000
55,000
40,000
25,000
15,000
Universe PFS Price: US$1,170
0
Universe PFS Price: US$20,970
0
Figure 2: Spodumene SC6 historical prices vs LU7 Forecast
Figure 2: Spodumene SC6 historical prices vs LU7 Forecast
Figure 3: BG Lithium Carbonate historical prices vs LU7 Forecast
Figure 3: BG Lithium Carbonate historical prices vs LU7 Forecast
Page 2
Quarterly Report | December 2024 | 2
Lithium Universe Limited | ASX: LU7
Figure 4: Model of the Lithium Universe Bécancour Lithium Refinery
Counter-Cyclical Strategy
Lithium Universe employs a counter-cyclical strategy,
developing projects during market downturns to position
for recovery. Despite recent price declines due to
oversupply, the company remains confident in strong longterm lithium demand driven by EV and energy storage
growth. Although LU7 demonstrates viability even in low
price environments, LU7 aims to capitalize on future price
recovery and market opportunities.
Closing the Lithium Conversion Gap
Over 90% of LFP battery manufacturing is concentrated
outside North America, but the region is expanding rapidly.
By 2028, nearly 1,000 GWh of capacity will be added,
requiring 850,000t of LCE annually. With no current lithium
converters, efforts are underway to reduce reliance on
foreign supply chains.
Quarterly Report | December 2024 | 3
Lithium Universe Limited I Quarterly Report I September
2024
Lithium Universe Limited | ASX: LU7
Quebec Trans Atlantic Lithium Conversion Centre
Québec is emerging as a strategic trans-Atlantic hub for
Quebecconversion,
Trans Atlantic
Lithium
Conversion
Centrelowlithium
benefiting
from
local feedstock,
cost
green
and proximityhub
to key
Québec
is energy
emerging(US$0.026/kWh),
as a strategic trans-Atlantic
for
lithium
regions. Thebenefiting
US Inflation
Act, European
lithium conversion,
fromReduction
local feedstock,
low-cost
green energy (US$0.026/kWh), and proximity to key lithium
Battery Passport, and significant tariffs placed on raw maregions.
Thecreate
US Inflation
Reduction
European
Battery
terial
imports
opportunities
for Act,
Québec
to supply
the
Passport,
and
significant
tariffs
placed
on
raw
material
imports
growing North American market.
create opportunities for Québec to supply the growing North
American market.
Figure 5: Electricity prices in Trans-Atlantic Region
Technology Challenges and Failures
Technology Challenges and Failures
Replicating Jiangsu Success
LU7North
addresses
theLithium
recurring
issues
by western
The
American
project
wentfaced
bankrupt
in 2015,
lithium
conversion
projects
worldwide,
offering
a
robust
producing only 109 tonnes of lithium carbonate despite
solution
the industry's
common
startup
problems.
The
CAD
250tomillion
invested.
Nemaska
Lithium
also failed
North
American
Lithium
project
went
bankrupt
in
2015,
after spending CAD 411 million. The Tianqi Kwinana and
producing Kemerton
only 109 tonnes
lithium carbonate
despite
Albemarle
plants inofAustralia
struggled with
unCAD
250
million
invested.
Nemaska
Lithium
also
failed
proven technologies and design issues, leading to delays
aftercost
spending
CADThe
411 million.
Tianqileach
Kwinana
and
and
overruns.
alkalineThe
pressure
process
Albemarle
Kemerton
plants
in
Australia
struggled
with
remains unreliable due to severe operational challenges.
unproven technologies and design issues, leading to
delays and cost overruns. The alkaline pressure leach
process remains unreliable due to severe operational
challenges.
Replicating Jiangsu Success
2012,the
the17,000
17,000tpa
tpaJiangsu
Jiangsu Lithium
Lithium Carbonate
Carbonate Plant,
InIn2012,
Plant,
engineered
by
Hatch
Ltd.
under
Iggy
Tan
and
Dr.
engineered by Hatch Ltd. under Iggy Tan and Dr. Jingyuan
Jingyuan
world's
largest
lithium
refinery,
Liu,
becameLiu,
thebecame
world’s the
largest
lithium
refinery,
exceeding
exceeding
design
capacity.The
Company's
strategy
to
design capacity. The Company’s strategy to mitigate techmitigate
technology
risks involves
same
flow
nology
risks
involves using
the sameusing
flowthe
sheet,
equipsheet,
equipment,
and
suppliers
that
were
successfully
ment, and suppliers that were successfully implemented
at the Jiangsu
Lithium
Carbonate
Plant.this
By
atimplemented
the Jiangsu Lithium
Carbonate
Plant.
By replicating
replicating
this
proven
approach,
the
Company
proven approach, the Company minimizes operational unminimizesand
operational
and ensures
reliable
certainties
ensures uncertainties
reliable performance,
leveraging
performance,
leveraging
established
processes
and
established processes and trusted suppliers to deliver contrusted
suppliers
deliver consistent results in new
sistent
results
in newtoprojects.
projects.
Page 4
Quarterly Report | December 2024 | 4
Replicating Jiangsu Success
In 2012, the 17,000 tpa Jiangsu Lithium Carbonate Plant,
engineered by Hatch Ltd. under Iggy Tan and Dr.
Jingyuan Liu, became the world's largest lithium refinery,
exceeding design capacity.The Company's strategy to
mitigate technology risks involves using the same flow
sheet, equipment, and suppliers that were successfully
implemented at the Jiangsu Lithium Carbonate Plant. By
replicating this proven approach, the Company
minimizes operational
uncertainties
ensures
reliable
Lithium
Universeand
Limited
| ASX:
LU7
performance, leveraging established processes and
trusted suppliers to deliver consistent results in new
projects.
Figure 5: Galaxy Jiangsu Lithium Carbonate Plant
Figure 6: Galaxy Jiangsu Lithium Carbonate Plant
Page 5
Quarterly Report | December 2024 | 5
Lithium
Lithium
Universe
Limited
Quarterly
Report
September
2024
LithiumUniverse
UniverseLimited
LimitedI IIQuarterly
QuarterlyReport
ReportI IISeptember
September2024
2024
Lithium Universe Limited | ASX: LU7
LithiumDream
Dream Team
Lithium
Lithium
Team
LithiumDream
DreamTeam
Team
The Company is comprised of lithium industry leaders
The
isisiscomprised
ofoflithium
industry
leaders
The
Company
comprised
lithium
industry
leaders
TheCompany
Company
comprised
lithium
industry
leaders
known
for rapidly
developingof
and
operating
Australian
known
for
rapidly
developing
and
operating
Australian
known
for
rapidly
developing
operating
Australian
known
forlithium
rapidlyextraction
developing
and
operating operations
Australian
hard
rock
andand
downstream
hard
rock
lithium
extraction
and
downstream
operations
hard
rock
lithium
extraction
and
downstream
operations
hard
rock
lithium
extraction
and
downstream
operations
in China. In an emerging industry like lithium, where reinin
InIn
industry
like
where
China.
emerging
industry
like
lithium,
where
inChina.
China.
Inanan
anemerging
emerging
industry
likelithium,
lithium,
where
taining
experienced
personnel
is increasingly
challengretaining
experienced
personnel
is
increasingly
retaining
personnel
retaining
experienced
personnela is
is increasingly
increasingly
ing,
Lithiumexperienced
UniverseUniverse
has assembled
proven
challenging,
Lithium
has
assembled
aexpertise
challenging,
Lithium
Universe
has
assembled
aaproven
proven
challenging,
Lithium
Universe
has
assembled
proven
team, including Mr. Iggy Tan (Executive Chairman),
Mr.
Iggy Tan,
Iggy
IggyTan,
Tan,
Chairman
Chairman
Chairman
Ex Galaxy
MD
Ex
ExGalaxy
GalaxyMD
MD
Terry Stark
Stark
Terry
Stark
Head ofTerry
Mining
Head
of
Head
ofMining
Mining
Ex Galaxy GM
Ops
Ex
ExGalaxy
GalaxyGM
GMOps
Ops
Roger Pover
Roger
RogerPover
Pover
Head of Li Processing
Head
of
Li
Head
of
LiProcessing
Processing
Ex Galaxy Plant
Manager
Ex
ExGalaxy
GalaxyPlant
PlantManager
Manager
expertise
expertise
team,
including
Mr.
Iggy
Tan
(Executive
expertiseteam,
team,including
includingMr.
Mr.Iggy
IggyTan
Tan(Executive
(Executive
Patrick
Scallan
(Non-Executive
Director),
Dr.
Jingyuan
Liu
Chairman),
Mr.
Patrick
Scallan
(Non-Executive
Chairman),
Director),
Chairman),Mr.
Mr.Patrick
PatrickScallan
Scallan(Non-Executive
(Non-ExecutiveDirector),
Director),
(Non-Executive
Director),
Mr.
John
Loxton
(Head
of
LithDr.
Jingyuan
Liu
(Non-Executive
Director),
Mr.
John
Dr.
Dr. Jingyuan
Jingyuan Liu
Liu (Non-Executive
(Non-Executive Director),
Director), Mr.
Mr. John
John
ium
Refinery),
Terry Refinery),
Stark
(Head
ofTerry
Mining),
and
Mr.
Loxton
(Head
Mr.
Stark
(Head
Loxton
(Head
of
Lithium
Refinery),
Mr.
Terry
Stark
(Head
Loxton
(HeadofMr.
ofLithium
Lithium
Refinery),
Mr.
Terry
Stark
(Head
ofof
Mining),
and
Mr.
Roger
Pover
(Head
of
Processing),
all
Roger
Pover
(Head
of
Processing),
all
of
whom
bring
exof Mining),
Mining), and
and Mr.
Mr. Roger
Roger Pover
Pover (Head
(Head of
of Processing),
Processing), all
all
ofof
bring
extensive
lithium
industry
expertise
tensive
lithium
industry
expertise
and
experience.
whom
bring
extensive
lithium
industry
expertise
and
ofwhom
whom
bring
extensive
lithium
industry
expertiseand
and
experience.
experience.
experience.
Dr Jingyuan Liu
Dr
DrJingyuan
Jingyuan
Liu
DirectorLiu
Director
Director
Ex Galaxy GM Technology
Ex
ExGalaxy
GalaxyGM
GMTechnology
Technology
Patrick Scallan
Patrick
Scallan
Patrick
Scallan
Director
Director
Director
EX Talison
GM
EX
EXTalison
TalisonGM
GM
John Loxton
John
Loxton
John
Loxton
Head of Li
Refinery
Head
Li
Head
of
LiRefinery
Refinery
Ex Hatch Liof
Carb
Plant
Ex
ExHatch
HatchLi
LiCarb
CarbPlant
Plant
John Sobolewski
John
JohnSobolewski
Sobolewski
Chief Financial
Officer
Chief
Financial
Officer
Chief
Financial
Officer
Ex Galaxy CFO & Company
Secretary
Ex
ExGalaxy
GalaxyCFO
CFO&&Company
CompanySecretary
Secretary
Bécancour
Industrial
Park
Bécancour
Park
Bécancour
Industrial
Park
BécancourIndustrial
Industrial
Park
LithiumUniverse
Universehas
hasexecuted
executedanan
option
agreement
Lithium
option
agreement
onon
aonaa
Lithium
Universe
has
executed
an
option
agreement
Lithium
Universe
has
executed
an
option
agreement
on
a key
property
within
the
BécancourWaterfront
WaterfrontIndustrial
Industrial
key
within
the
Bécancour
key
property
within
the
Bécancour
Waterfront
Industrial
keyproperty
property
within
the
Bécancour
Waterfront
Industrial
Park
situated
on
the
St
Lawrence
River
between
MontrePark
situated
on
the
St
Lawrence
River
between
Park
situated
on
the
St
Lawrence
River
between
Park
situated
on
the
St
Lawrence
River
between
al and Québec
City. The
site,
strategically
located
near a
Montreal
and
Québec
City.
The
site,
strategically
located
Montreal
and
Québec
City.
The
site,
strategically
located
Montreal
and
Québec
City.
The
site,
strategically
located
major
highway
and served
by Canadian
NationalNational
Railway,
near
and
served
byby
Canadian
near
major
highway
and
served
Canadian
National
nearaaamajor
majorhighway
highway
and
served
by
Canadian
National
offers
year-round
access
to
the
Port
of
Bécancour,
featurRailway,
Railway,
offers
year-round
access
the
Port
Railway,offers
offersyear-round
year-roundaccess
accesstoto
tothe
thePort
Portofof
of
ing a deep-water
pier and
multiple berths,
making
it ideal
Bécancour,
featuring
a
deep-water
pier
and
multiple
Bécancour,
Bécancour, featuring
featuring aa deep-water
deep-water pier
pier and
and multiple
multiple
for the proposed
Lithium Carbonate
Refinery. Lithium
berths,
berths,
making
ideal
for
the
proposed
berths,making
makingitititideal
idealfor
forthe
theproposed
proposed Lithium
Lithium
Carbonate
Refinery.
Carbonate
CarbonateRefinery.
Refinery.
Funding Strategy
Funding
Funding
Strategy
FundingStrategy
Strategy
Funding
plans
for the capital costs involve inviting one or
Funding
plans
for
involve
two
strategic
partners
to
join costs
as
49%
equityinviting
partners
at or
the
Funding
plans
for
the
capital
costs
involve
inviting
one
or
Funding
plans
forthe
thecapital
capital
costs
involve
invitingone
one
or
two
strategic
partners
to
join
as
49%
equity
partners
at
project
level.
The
Company
is
also
in
the
process
of
aptwo
two strategic
strategic partners
partners to
to join
join as
as 49%
49% equity
equity partners
partners at
at
the
project
level.
The
Company
is
also
in
the
process
of
pointing
a
debt
advisor
and
has
already
initiated
discusthe
project
level.
The
Company
is
also
in
the
process
of
the project level. The Company is also in the process of
appointing
aaadebt
advisor
already
sions
with financial
Thehas
Company
willinitiated
actively
appointing
debt
advisor
and
has
already
initiated
appointing
debtinstitutions.
advisorand
and
has
already
initiated
discussions
with
financial
institutions.
The
Company
will
engage
with with
financial
institutions
and government
agendiscussions
financial
institutions.
The
will
discussions
with
financial
institutions.
The Company
Company
will
actively
engage
with
financial
institutions
and
cies
to secure
project
financing
by presenting
the findings
actively
engage
with
financial
institutions
and
actively
engage
with
financial
institutions
and
government
agencies
toto
project
financing
from
the Preliminary
Feasibility
Study
(PFS).
government
agencies
secure
project
financing
government
agencies
tosecure
secure
project
financingbyby
by
presenting
presenting
the
findings
from
the
Preliminary
Feasibility
presentingthe
thefindings
findingsfrom
fromthe
thePreliminary
PreliminaryFeasibility
Feasibility
Study
Study
(PFS).
Study(PFS).
(PFS).
Figure 6: The Company's refinery site within the Bécancour Industrial Facility situated
Figure
The
Company's
within
the
Bécancour
Industrial
Facility
situated
Figure7:6:
6:The
TheCompany’s
Company'srefinery
refinery
site
within
thethe
Bécancour
Industrial
Facility
situated
Figure
refinerysite
site
within
Bécancour
Industrial
Facility
between Montreal and Québec City.
between
Montreal
and
City.
betweenbetween
MontrealMontreal
andQuébec
Québec
City.
situated
and
Québec City.
Page
Page
Page666
Quarterly Report | December 2024 | 6
The design of the Bécancour Lithium Carbonate Plant
will be modelled
afterRefinery
the proven Jiangsu facility, with
Bécancour
Lithium
primaryPlant
targeted
operational
enhancements.
The design of the Bécancour Lithium The
Carbonate
objective
of this engineering
studyJiangsu
is to develop
will
be modelled
after the proven
facility,awith
Bécancour
Lithium
Refinery
comprehensive
design
and
cost
estimation
for a
targeted operational enhancements. The primary
standalone
lithium
plant
The
designofofbattery-grade
theengineering
Bécancour
Lithium
Plant
objective
this
studycarbonate
isCarbonate
to develop
a withwill
an
annual
capacity
of
up
to
18,270
tons
per
annum
be
modelled
after
the
proven
Jiangsu
facility,
with
targeted
comprehensive design and cost estimation for a
(tpa). This facility
will be engineered
to process
operational
enhancements.
The primary
objective
of this
standalone
battery-grade
lithium
carbonate
plant with
spodumene
concentrate
sourced
globally.
The
required
engineering
study isoftoup
develop
a comprehensive
design
an
annual capacity
to 18,270
tons per annum
feedstock
for
the
plant
will
be
approximately
140,000
and
cost
estimation
for
a
standalone
battery-grade
(tpa). This facility will be engineered to process lithium
tpa at 6% Li
O grade
however,
the
plant of
has
carbonate
plant
with an
annual
capacity
upbeen
torequired
18,270
2concentrate
spodumene
sourced
globally.
The
designed
to
receive
grades
as
low
as
5%
Li
O.
tons
per
annum
(tpa).
feedstock for the plant will be approximately2 140,000
Typically,
spodumene
tpa
at 6% industry-supplied
Li2O grade however,
the plant averages
has been
around
5.5%
Li
O.
2
designed
to
receive
grades
as
low
as
5%
2O.
Table 1.Bécancour Lithium Refinery KeyLiCriteria
Typically,
industry-supplied
spodumene
averages
Bécancour
Lithium Refinery
Key Criteria
around 5.5% Li2O.
Inputs
Bécancour
Refinery
Key
Criteria
EstimatedLithium
Production
Battery
Grade
Lithium Carbonate
Inputs
Assumed Spodumene Feedstock at 5.5% to 6% Li2O
Estimated
Production
Steady State
RecoveryBattery Grade Lithium Carbonate
The design of the Bécancour Lithium Carbonate Plant
will be modelled
afterRefinery
the proven Jiangsu facility, with
Bécancour
Lithium
The
primary
targeted
operational
enhancements.
Lithium
Universe
| ASX:
LU7
The design of the Bécancour
LithiumLimited
Carbonate
Plant
objective
of this engineering
studyJiangsu
is to develop
will
be modelled
after the proven
facility,awith
comprehensive
design
and
cost
estimation
for a
targeted operational enhancements. The primary
This
facilityofwill
engineered
tocarbonate
process
spodumene
standalone
battery-grade
lithium
planta with
objective
this be
engineering
study
is
to develop
concentrate
sourced
globally.
The
required
feedstock
for
an
annual
capacity
of
up
to
18,270
tons
per
annum
comprehensive design and cost estimation for
a
(tpa).
will be engineered
to process
the
plantThis
willfacility
be approximately
140,000
tpa plant
at 6%with
Li2O
standalone
battery-grade
lithium
carbonate
spodumene
concentrate
sourced
globally.
The
required
grade
however,
the plant
been tons
designed
to receive
an annual
capacity
of up has
to 18,270
per annum
feedstock
for
the
plant
will
be
approximately
140,000
grades
as
low
as
5%
Li2O.
Typically,
industry-supplied
(tpa). This facility will be engineered to process
tpa at 6% Li
O gradearound
however,
theLi2O.
plant has
spodumene
averages
5.5%
2concentrate
spodumene
sourced
globally.
Thebeen
required
designed
to
receive
grades
as
low
as
5%
Li
feedstock for the plant will be approximately2O.
140,000
Typically,
spodumene
tpa
at 6% industry-supplied
Li2O grade however,
the plant averages
has been
around
5.5%
Li
O.
2
designed to receive
grades as low as 5% Li O.
2
Typically, industry-supplied spodumene averages
around 5.5%Approximate
Li2O.
Volume (t/year)
Assumed
Spodumene
Feedstock
at shutdowns)
5.5% to 6% Li2O
Steady State
Availability
(inc annual
Steady
State
Recovery
Ramp up
to full
rate
Steady State Availability (inc annual shutdowns)
Ramp up to full rate
16,748 (5.5% Feed) - 18,270 (6% Feed)
140,000 Approximate Volume (t/year)
16,748
88% (5.5% Feed) - 18,270 (6% Feed)
140,000
86%
88%
3 years
86%
3 years
Figure 7: Lithium Universe Bécancour Process Flow Sheet
Page 7
Figure 7: Lithium Universe Bécancour Process Flow Sheet
Figure 8: Lithium Universe Bécancour Process Flow Sheet
Page 7
Quarterly Report | December 2024 | 7
Lithium Universe Limited I Quarterly Report I September 2024
Lithium Universe Limited | ASX: LU7
Plant
Layout
Plant Layout
An overall
overall site
sitelayout
layoutplan
planwas
wasdeveloped
developedwhere
wherethe
themain
facilities
and major
piecespieces
of equipment
are identified,
main facilities
and major
of equipment
are i.e.
the
spodumene
stockpile,feed
kilns,
driers, cooler,
identified,
i.e. thefeed
spodumene
stockpile,
kilns, ball
driers,
mill, belt
process
tanks
andand
mill,
beltcooler,
filters,ball
process
tanksfilters,
and bins,
reagent
tanks
reagent tanks
and
thickeners,
Area 40 includand
bins, thickeners,
Area
40bins,
and 60
process building
60 process
building
including
amenities,
laboratory
ing
amenities,
laboratory
and office,
lithium
product and
storoffice,sodium
lithiumsulphate
product storage, main
sodium
sulphate air comage,
substation,
storage,building
main substation,
air compressor
building
and
pressor
and maintenance
and stores.
The layout
maintenance and stores. The layout defines the roads
required for delivery of raw materials and shipment of
defines
theand
roads
required The
for delivery
of raw
materials
products
co-products.
main piping
racks
for
and
of of
products
co-products.
Thepiping
mainand
piptheshipment
reticulation
utilities,and
reagents,
process
ing
racks
for
the
reticulation
of
utilities,
reagents,
process
electrical cable trays have been defined on the layout.
piping
and
electrical
cablesuch
traysashave
definedare
on the
All gas
fired
equipment
kilnsbeen
and driers
layout.
Alloutside
gas fired
as kilns
driers are
located
of equipment
buildings tosuch
reduce
risksand
associated
located
outside
of
buildings
to
reduce
risks
associated
with use of natural gas. Most of the plant areas are inwith
use
of natural
gas.asMost
plant areas of
arethe
in heated
heated
buildings
partofof the
a winterization
buildings
as
part
of
a
winterization
of
the
process.
process.
Figure 9: Lithium Universe Bécancour Refinery Plant Layout
Figure 8: Lithium Universe Bécancour Refinery Plant Layout
OPERATINGCost
COST
ESTIMATE
Operating
Estimate
tonne of LC, compared
to approximately
US$3,976 per
approximately
US$3,976 per
tonne in Bécancour.
tonne in Bécancour.
However,
25% tariffs
tariffs
However,with
withthe
theUS
US and
and Canada imposing 25%
ononChinese-sourced
2024,
Chinese-sourcedlithium
lithium chemicals
chemicals starting
starting in 2024,
the
to around
around
theeffective
effectiveconversion
conversioncost
costinin China
China will rise to
US$4,812(comparison
(comparisonbasis)
basis)
tonne
of LC,
US$4,812
perper
tonne
of LC,
whilewhile
BéBécancour
operational
remain at
cancour
operational
estimates estimates
remain at approximately
approximately
This cost why
advantage
US$3,976.
This costUS$3,976.
advantage underscores
the comunderscores
why
the
company
believes
Québec
hasa the
pany believes Québec has the potential to emerge as
key
potential
to
emerge
as
a
key
conversion
hub
for
the
transconversion hub for the trans-Atlantic region.
Atlantic region.
The operating
on the
balancebalance
The
operatingcost
costis based
is based
on mass
the mass
usage
of
electricity.
natural
gas,
sulphuric
usage of electricity, natural gas, sulphuricacid,
acid,sodium
sodium
carbonate,
neutralising
agents,
and
various
reagents
carbonate, neutralising agents, and various reagents
and consumables
Jiangsu
operating
and
consumablesextracted
extractedfrom
from
Jiangsu
operating
experience.
experience.
The operating costs at the Bécancour site are
approximately
tonneBécancour
of lithium carbonate
The
operatingUS$3,976
costs atper the
site are
(Li2CO3) benefiting
from inexpensive
power
approximately
US$3,976
per tonne ofrenewable
lithium carbonate
from Hydrobenefiting
Québec, from
costing
approximately
US$0.026
(Li2CO3)
inexpensive
renewable
power
per kWh.
In comparison,
the average
operatingUS$0.026
costs
from
Hydro
Québec, costing
approximately
in
China
are
around
US$3,250
per
tonne
of
Li
CO
per kWh. In comparison, the average operating
in
2 costs
3,
Other
wit