Latest Company Presentation
PRECIOUS METALS EXTRACTION
RECYCLING DIVISION
Silver Extraction from PV Recycling Gold Copper Extraction from E Waste
GOLD COPPER EXTRACTION FROM
E-WASTE
WHAT IS E-WASTE
• Discarded electrical, electronic equipment,
computers, phones, and circuit boards
• Est 93.5 Mt to end in Land Fill
• Growing hazardous waste stream
OUR E-WASTE PROBLEM
<20% ARE RECYCLED
• Rest are dumped in land fills
• Reason – complex metals and polymers – costly
• High temp smelting and chemical leaching
• Shipped to third world countries – combustion
• Proven large-scale industrial recovery technology
• Processes complex mixed electronic waste streams
• Operates at extremely high temperatures
• High energy use and carbon emissions
• Requires expensive smelting infrastructure
• Precious metals diluted into molten copper
• Multiple downstream refining stages required
TRADITIONAL E-WASTE SMELTING
GOLD USE IN CIRCUIT BOARDS
• Gold is applied to PCB edge connectors
• Contact pads, switch contacts and thin protective
board coatings
• Fine bonding wires linking chips to their packages
GOLD COPPER IN CIRCUIT BOARDS
COPPER USE IN CIRCUIT BOARDS
• Backbone in all circuitry
• Used internal wiring, PCB layers, charging ports
• Connectors, battery terminals, inductors
• Small coils, electronic heat spreaders
GOLD AND COPPER IN E-WASTE
• Approx 200–350 grams of Au /tonne of E-waste
• Printed Circuit Boards – up to 900 grams Au /tonne
• Cu in E-waste ranges from 50–270 kg per tonne
• Significant silver, palladium and rare metals also
recoverable
• E-waste represents one of the world’s richest urban
ore sources
URBAN MINING & EXTRACTION
URBAN MINING & EXTRACTION
GOLD MINE VS E-WASTE COMPARISON
• Approx. 200–350 grams Au per tonne of E-waste
• Typical gold mines average only 5–7 g/t Au
• E-waste grades can exceed mines by > 50 times
• Urban mining reduces dependence on new gold mines
• Lower environmental footprint than conventional mining
• Reduces landfill and hazardous e-waste accumulation
• Recovers valuable metals sustainably
• Domestic critical metal supply
• Faster permitting potential
GOLD
• Supply constrained, capital intensive, slow to
permit and develop
• Total gold production = 5,000 tonnes per year
• At current price of US$4,500 /oz - 300 grams /t
US$43,700 per tonne E-waste
DEMAND SUPPLY - GOLD & COPPER
COPPER
• Total Cu supply – 32-34 million tonnes
• Demand ~28-30 million tonnes per year
• Current LME price of copper – US$9,800 p/t
• Ave 160 kg/t in E-waste worth US$1,570 /tonne
TYPICAL E-WASTE RECYCLING PLANT
Can purchase E-waste to
feed into GCDE Technology
• Agreement to acquire global rights
• New hydrometallurgical processes for e-waste recycling
• Ability to selectively extract gold and copper from E-Waste
• Prof Jason Love & Prof Carole Morrison
• Edinburgh University – School of Chemistry
• Patents (pending) Europe and USA
• EU shares in success – 2-3% Royality Rights
• Collaborative future research together
LU7 ACQUIRES GOLD COPPER DIAMIDE
EXTRACTION (GCDE) TECHNOLOGY
DIAMIDE LIGAND
• Organic compound – Amide Ligand
• Contains two coordinating amide donor sites
• Selectively binds Au³⁺ chloride complexes in solution
• Forms a stable gold–ligand coordination complex
• Operates effectively in acidic chloride media
• High affinity for gold over base metals
• Minimal co-extraction of copper and iron
• Gold complex precipitates or transfers to organic phase
• Ligand can be regenerated and reused after stripping
GCDE TECHNOGY
• Hydro-met process instead of smelting
• Uses a diamide ligand as a selecting agent
• Acts like selective “magnets” for Gold
• Circuit board metals are dissolved in acid (HNO3 HCL)
• Solution contains many metal ions and impurities
• Gold and copper - soluble chloride AuCl₄⁻ CuCl₄²⁻
• Diamide is added - selectively bind to the gold ion
• Diamide gold complex crystallizes, settles
• Gold complex filtered, washed and further refined
• Diamide reagent recovered for reuse multiple times
STAGE 1 – GOLD EXTRACTION
STAGE 2 – COPPER EXTRACTION
• LU7 secured exclusive global GCDE commercialization rights
• Agreement signed with University of Edinburgh
• Patents pending in Europe and United States
• LU7 may commercialize and sublicense technology globally
• Edinburgh receives 2–3% revenue royalty payments
• License term extends up to 20 years
• Milestone payments linked to pilot and commercialization
stages
LU7 ACQUIRES GCDE TECHNOLOGY
SILVER EXTRACTION FROM PV
RECYCLING
• Australian target of 82% renewable energy by 2030
• Target of 43 per cent reduction in carbon emissions
• PV solar panels key to energy transition
• Renewable electricity generation – quicker, cheapest
• Global PV market - US$39.8 billion by 2037
• Growing at a CAGR of around 8.2%
PV SOLAR PANELS KEY TO TRANSITION
• 37% of Australian households - installed PV panels
• 4 million homes and small businesses
• In 2024, 12.4% of Aust electricity came from rooftop solar
• Forecast utility-scale PV to surpass 50 GW by 2030
AUSTRALIA - PV SOLAR PANELS
• Globally 60-78mt accumulated waste PV by 2050
• Australia 1 Mt end-of-life PV worth $1B by 2045
• Only 15% of PV cells today are recycled
• Rest ends up in LAND FILL
• Valuable silicon, silver, gallium & indium
THE PROBLEM TODAY
15%
• About 20 grams of Silver – each PV panel
• Electrical contacts – flow of electricity
• “Fingers" (thin lines) and "busbars" (thicker lines)
• >A$67 of Silver in every panel
SCRAPING VALUABLE SILVER
“Australia is about to be hit by a Tsunami of
Solar Waste”
(International Energy Agency))
PV SOLAR CELL
Frame
Front Glass
Encapsulant (EVA)
Solar Cell
Encapsulant (EVA)
Back Sheet
CRITICAL METALS LOST FROM
INEFFICIENT RECYCLING
Silicon
(Semiconductor)
Silver
(Electrical
Conductivity)
Gallium
(Energy
Efficiency)
Indium
(Energy
Absorption)
In Fact, the Silver that’s contained inside Solar
Modules equates to in its totality, Australia’s Biggest
Silver Mine”
(Australia Smart Energy Council)
• Record demand 680 million ounces in
2024
• Industrial demand surged by 7%
• Growth is expected to carry beyond 2025
• Photovoltaics and AI as the fastest-
growing drivers
SILVER MARKET
2015 2016 2017 2019
2018 2020 2021
Photovoltaics
Other
Source: Metals Focus, Wisdom Tree, January 2025 Electrical
Photovoltaics (Share Right)
2023
2022 2024 2025
Brazing Alloys & solders
700
600
500
400
300
200
100
0
Million
ounces
Photovoltaic
chare
0%
5%
10%
15%
20%
25%
30%
35%
Other Electrical
• Demand has started to outstrip supply
• Market deficit 118 mil oz
• Significant silver price increase
• US$15/oz in 2018 to US$73/oz 2025
• 380% increase since 2018
• Silver recovery from recycling will
become increasing important
SILVER PRICE RESPONSES
• 3.45 million tonnes in 2025
• 4.49 million tonnes by 2030 growing at
CAGR 5.41% pa
• Solar panels projected highest growth
rate of 7% til 2029
• Silicon dominance in semi-conductor
material in solar cells
SILICON MARKET
3.45 million
4.49 million
2025 2030
Source: Mordo Intelligence
Silicon Metal Market
Market Size in Million Tonnes
CAGR 5.41% Metal Market
• Shredding and grinding PV cells
• EVA (binder) is removed by high temperatures
• EVA removed by toxic acid chemicals
• Low value glass applications – insulation, buildings
• Low silicon and silver recovery
• Due to complexity, high cost, poor yields
TRADITIONAL PV RECYCLING
Material
Extraction
Mechanical
Breakdown
Initial
Dismantling
• Microwave Joule Heating Technology (MJHT)
• Jet Electrochemical Silver Extraction (JESE)
• Layer by layer separation
• Preserves materials in cleaner separable form
• High value products instead of waste
LU7 PV RECYCLING TECHNOLOGY
• Microwave Joule Heating Technology (MJHT)
• Utilizes Microwave Technology
• Selectively heat and delaminates PV cells
• Glass panel instead of crushed glass
• Silicon sheet instead of crushed powder
• High value products instead of waste
MICROWAVE DELAMINATION
Back Sheet or
Glass Plate
Solar Cells
Glass Plate
Microwave Radiation
EVA
Sheets
Microwave Delamination
Front Glass
EVA
EVA
Solar Cell
Backing Plate
MJHT SELECTIVE DELAMINATION
Back Sheet or
Glass Plate
Solar Cells
Glass Plate
Microwave Radiation
EVA
Sheets
Front Glass
EVA
EVA
Solar Cell
Backsheet
Front Glass Delamination
Front Glass
EVA
EVA
Solar Cell
Backsheet
Back Sheet Delamination
Microwave Delamination
Front Glass
EVA
EVA
Solar Cell
Backing Plate
Back Sheet or
Glass Plate
Solar Cells
Glass Plate
Microwave Radiation
EVA
Sheets
Front Glass
EVA
EVA
Solar Cell
Backsheet
Front Glass Delamination
Front Glass
EVA
EVA
Solar Cell
Backsheet
Back Sheet Delamination
Microwave Delamination
Front Glass
EVA
EVA
Solar Cell
Backing Plate
Silicon Wafer
Clean Glass Sheet to be Reused
Silicon Wafer for Silver Extraction &
Silicon Recycling
Front Glass
Silver
(High Purity)
Silicon
(High Purity)
• Jet Electrochemical Silver Extraction (JESE)
• Uses electrochemical low-voltage jet to selectively
extract silver
• Silver dissolves into dilute nitric acid electrolyte
• Leaves aluminum and other impurities behind
• High purity silver metal recovered from electrolyte via
electrochemical deposition
SILVER EXTRACTION
Anode
Cathode
Cathode
Anode
Silver
Deposition
Silver
Extraction
SILVER EXTRACTION SILVER DEPOSITION
High Purity
Silver
Solar Cell
• Silver removal leaves impurities – adjust voltage
• Silver deposited at the same process
• Recoveries better than 95%
• 96% purity of silver deposited
• Dopants can be cleaned off silicon wafer
• Silicon wafer high purity for direct reuse
• All high value separate products
ACHIEVEMENTS
Deframe Delamination
Solar Panel
Delamination
EVA Removal
Silver Electro
Jet Removal
Al Junction
Box
Copper
Wires
Reusable
Glass
Sheet
High Purity
Silicon Feed
Solid Silver
(High Purity)
Macquarie MJHT
Technology
Macquarie JESE
Technology
Silver Electro
Deposition
Silicon
Wafer
EVA
Silicon Wafer
RECYCLING TECHNOLOGY
MICROWAVE JOULE
HEATING TECHNOLOGY
(MJHT)
Artist Impression
JET ELECTROCHEMICAL
SILVER EXTRACTION
(JESE)
Artist Impression
PRECIOUS METALS EXTRACTION
RECYCLING DIVISION
Silver Extraction from PV Recycling Gold Copper Extraction from E Waste
CAUTIONARY STATEMENTS
Information Required by Listing Rules
The Becancour Lithium Refinery Definitive Feasibility Study (PFS) does not rely upon estimated ore reserves / and or mineral resources. The spodumene concentrate feedstock for the proposed refinery has been assumed to have been purchased directly from
spodumene miners currently producing spodumene concentrates or marketing agents or traders currently purchasing spodumene concentrate and selling to the downstream processors. Accordingly, the JORC Code is not relevant to this study nor are Listing Rules
5.16 and 5.17 to the extent to which they relate to matters concerning JORC.
Forward Looking Statements
This release contains “forward-looking information” that is based on the Company’s expectations, estimates and projections as of the date on which the statements were made. This forward-looking information includes, among other things, statements with respect to
studies, the Company’s business strategy, plan, development, objectives, performance, outlook, growth, cash flow, projections, targets and expectations. Generally, this forward looking information can be identified by the use of forward-looking terminology such as
‘outlook’, ‘anticipate’, ‘project’, ‘target’, ‘likely’,’ believe’, ’estimate’, ‘expect’, ’intend’, ’may’, ’would’, ’could’, ’should’, ’scheduled’, ’will’, ’plan’, ’forecast’, ’evolve’ and similar expressions. Persons reading this news release are cautioned that such statements are only
predictions, and that the Company’s actual future results or performance may be materially different. Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the Company’s actual results, level of activity,
performance or achievements to be materially different from those expressed or implied by such forward-looking information. Forward-looking information is developed based on assumptions about such risks, uncertainties and other factors set out herein, including but
not limited to general business, economic, competitive, political and social uncertainties; the actual results of current development activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; future prices of metals;
failure of plant, equipment or processes to operate as anticipated; accident, labour disputes and other risks of the chemical industry; and delays in obtaining governmental approvals or financing or in the completion of development or construction activities. This list is
not exhaustive of the factors that may affect our forward-looking information. These and other factors should be considered carefully, and readers should not place undue reliance on such forward-looking information. Neither the Company, nor any other person, gives
any representation, warranty, assurance or guarantee that the occurrence of the events expressed or implied in any forward-looking statement will actually occur. Except as required by law, and only to the extent so required, none of the Company, its subsidiaries or its
or their directors, officers, employees, advisors or agents or any other person shall in any way be liable to any person or body for any loss, claim, demand, damages, costs or expenses of whatever nature arising in any way out of, or in connection with, the information
contained in this document. The Company disclaims any intent or obligations to or revise any forward-looking statements whether as a result of new information, estimates, or options, future events or results or otherwise, unless required to do so by law.
Cautionary Statement
The DFS is based on the material assumptions outlined including that it has been completed in accordance with AACE Principles to a Class 5 level with a nominal level of accuracy of ± 35%, that the financial forecasts rely upon the purchase of third party spodumene
concentrate as the feedstock for the plant. The DFS referred to in this announcement has been undertaken to assess the potential technical feasibility and economic viability of constructing and operating facilities capable of producing battery grade lithium carbonate for
use in lithium-ion batteries from those units of operations and provide baseline financial metrics to consider future investment decisions.
The Definitive Feasibility Study (PFS) is based on the material assumptions. These include assumptions about the availability of funding. While Lithium Universe considers all of the material assumptions to be based on reasonable grounds, there is no certainty that
they will prove to be correct or that the range of outcomes indicated by the DFS will be achieved. To achieve the range of outcomes indicated in the DFS, funding of in the order of US$600 million will likely be required. Investors should note that there is no certainty that
Lithium Universe will be able to raise that amount of funding when needed. It is also likely that such funding may only be available on terms that may be dilutive to or otherwise affect the value of Lithium Universe’s existing shares. It is also possible that Lithium
Universe could pursue other ‘value realisation’ strategies such as a sale, partial sale or joint venture of the project. If it does, this could materially reduce the Company’s proportionate ownership of the project. Given the uncertainties involved, investors should not make
any investment decisions based solely on the results of the DFS
Share your feedback