Corporate Presentation
Released
Released
Announcement PDF
WATCH PRESENTATION HERE
A person in a suit and tie
Description automatically generated
UPSTREAM | MINE SUPPLY
• +40 companies Quebec
• >500Mt +1% Li2O resource
• Transatlantic supply – Canada, Brazil,
Africa
THE LITHIUM GAP
DOWNSTREAM | DEMAND
• Nth America battery manufacturing
• +20 manufacturers
• Add 1,000GW by 2028
• Tenfold increase in current capacity
• 850,000t LCE per year
THE LITHIUM GAP
THE LITHIUM GAP
CURRENT CONVERSION
DOWNSTREAM | REGULATION
• Cut Chinese battery material reliance
• Chinese firms ordered to exit
• 25% tariffs on Chinese LCE
• Canada needs downstream solutions
THE LITHIUM GAP
LITHIUM | CONVERTORS
• No current lithium converters
• Only 100 Ktpa of converters planned
• No lithium refining experience
THE LITHIUM GAP
CLOSING
PROBLEMS FILLING THE GAP
• Complex chemical business
• Many failures, technical difficulties
• Existing Lithium producers
• Technology and People
Proven Technology
Experienced Operators
EXPERIENCED LITHIUM OPERATORS
• Ran Greenbushes Li in 1995
• Commissioned Li Carb Plant
• Galaxy - First mine to refinery project
• Built Mt Cattlin Spod Mine (137 ktpa)
• Built Jiangsu Li Carb Plant (17 ktpa)
• GXY MCap <$10 m $2.5b at merger
Iggy Tan
Chairman
THE DREAM TEAM
GREENBUSHES LITHIUM VETERAN
INTERNATIONAL DOWNSTREAM EXPERT
• Ran Greenbushes Mine for 25
years
• Ex-Galaxy GM Technology
• Leading technical expert in the
Lithium Industry
• Oversaw expansion from 200 Ktpa
to 1.4 Mtpa
Patrick Scallan OAM
Non-Executive Director
THE DREAM TEAM
• Largest spodumene & highest
grade operating mine in the world
Dr Jingyuan Liu PhD
Non-Executive Director
• Designed & Operated worldclass Jiangsu Lithium
Carbonate Refinery
THE LITHIUM DREAM TEAM
Terry Stark
Head of Mining
Ex Galaxy GM Operations
Roger Pover
Head of Processing
Ex Galaxy Plant Manager
John Loxton
Head of Li Refinery
Ex Hatch Li Carb Plant
John Sobolewski
Chief Financial Officer
Ex Galaxy CFO & Co Sec
FAILED CANADIAN Li PROJECTS
North American Lithium
• Shutdown 2015
• Spent circa CAD 250m
• Produced 109 t LC
THE COMPETITION
Nemaska Lithium
• DFS completed 2018
• Spent CAD 411 m
• Failed to start up 2019
TROUBLED LiOH PLANTS
Tianqi Kwinana LiOH
•
•
•
•
8 Years so far
Capital Cost Blowout
> A$1 billion
< 20% of design
THE COMPETITION
Albemarle Kemerton LiOH
•
•
•
•
5 years so far
Still <20% of design rate
Shut trains 2,3,4
Write down US$1.5 billion
Alkaline Pressure Leach
•
•
•
•
New Technology
Unproven
1995 Greenbushes 5Ktpa
Failed due to scaling
WHY HAVE THESE PROJECTS FAILED?
• Lack of operating supervision - design
• Chinese batch → Western continuous
• Use of unproven technology
Our Lithium Dream Team are Operators
DESIGN
DREAM TEAM TRACK RECORD
Jiangsu Li Carbonate Plant
2 Years to Commercial Production
Ground
Breaking
21 Feb 2010
Start of
Construction
1 May 2010
• Capital Cost – US$120 m
• At design rate 20,000 tpa
• Highest quality LC worldwide
Project
Completion
6 Dec 2011
(19 months)
6 May 2012
(6 months Commissioning)
Jiangsu Lithium Carbonate Plant
CLOSING THE LITHIUM GAP
BÉCANCOUR LITHIUM
REFINERY
• Replicate the success at Jiangsu
• 18,270 tpa green BG lithium carbonate plant
• Bécancour, Quebec’s Battery Hub
• Same flow sheet, same equipment, same suppliers
BECANCOUR LITHIUM REFINERY
STRONG POSITIVE
ROBUST PFS
1. LU7 ASX Announcement 30 Sept 24 – “Strong Preliminary Feasibility for Becancour Lithium Refinery”
1. LU7 ASX Announcement 30 Sept 24 – “Strong Preliminary Feasibility for Becancour Lithium Refinery”
WHY?
THE BIG WHY’s
• build a plant – low price environment?
• build a plant - others closing theirs?
• can you compete with China?
• lithium carbonate not hydroxide?
LU7 LITHIUM STRATEGY
COUNTER CYCLICAL STRATEGY
Why build a plant in a depressed-price environment?
• Been through 3-4 lithium cycles
• Prices have and will always recover
• Li demand from EVs and BESS growth strong
• Develop a project ready for price recovery
LU7 LITHIUM STRATEGY
SUPPLY DEMAND BALANCE
• Impact of supply reduction
• Dramatic reduction 17%, 21% next year
• Demand is severely underestimated
• Focus on EV’s only, BESS dark horse
• 1.8 TWh of batteries - 600 GWh solar plants
PRICES WILL RECOVER QUICKER THAN EXPECTED
LU7 LITHIUM STRATEGY
NEW CAPACITY IS REQUIRED
Why build a plant when others are closing theirs?
• Higher costs operations being closed
• Operations not performing, shutting down
• New efficient capacity is required for the growth
• World needs non-Chinese conversion
• Build conversion that works
LU7 LITHIUM STRATEGY
QUEBEC LITHIUM CONVERSION
Why can you compete with China?
• Access to Cheap Green Power
• 2.6 cents per kWhr (5 times cheaper)
• Nearby feedstock - Canada, Brazil and Africa
• Decrease in transport costs of spodumene
• End market North America
• Eliminate 25% tariff on Chinese Li chemicals
LU7 LITHIUM STRATEGY
BÉCANCOUR COST ADVANTAGE
Why can you compete with China?
Comparison to Chinese Conversion US$/t
Transport
+US$600/t
US$3,250 /t
Tariffs
+US$960/t
Canada
15% CHEAPER
LU7 US$3,970 /t
USA
Africa
Brazil
LU7 LITHIUM STRATEGY
Li CARBONATE WILL DOMINATE
Why Lithium carbonate not hydroxide?
• Track record in Li Carbonate
• Li Carb feed for LFP lithium batteries
• Switch to LFP battery - safety and costs
• LFP 67% of EVs, 87% of BESS
LU7 LITHIUM STRATEGY
GOOD LOCATION
THE LITHIUM REFINERY
THE LITHIUM REFINERY
BECANCOUR LITHIUM REFINERY
GOOD LOCATION
30,000 Spodumene Shipments
Bécancour
Lithium
Refinery
THE LITHIUM REFINERY
LITHIUM REFINERY FLOW SHEET
Cooler
Calciner
Spodumene
Alpha
Spodumene
Sulphuric
Acid
Beta
Spodumene
Cooler
Sulphating
Kiln
Ball Milling
Hydrated
Lime
Hydrated
Lime
Water
Filter
Process Liquor
Leaching
Tank
Wash
Water
Sodium
Sulphate
Product
Polishing
Filter
Alumina
Silicate
Centrifuge
Sodium Sulphate
Crystalliser
Dryer
Mg
Precipitation
Ca
Precipitation
PolishingFi
lter
Sodium
Carbonate
Sulphuric
Acid
Natural Gas
o/flow
Ion
Exchange
Li2CO3
Precipitation
Li Carb
Slurry Tank
Repulp
CO2
Battery Grade
Lithium Carbonate
Product
LiC
Microniser
Dryer
Battery Centrifuge
Grade
Steam
LC Crystalliser
CO2
Polishing
Filter
Bicarbonate
Digestor
PURIFICATION
PLANT
LITHIUM REFINERY DESIGN
ß Spod
Storage
Sulphation
Kiln
Calciner
Spodumene
Storage
Leaching
Sodium
Sulphate
Plant
Residue
Storage
Residue
Processing
Boilers
Cooling
Towers
Process Water
Treatment
Product
Warehouse
LiC Production
& Purification
THE LITHIUM REFINERY
Reagents
Storage
Maintenance
Building
Admin
Building
Impurity
Removal
ROBUST PROCESS
• Refinery to process all types of spodumene
• Sampled - international sources of spodumene
• Imports while Canadian Li industry develops
• Achieve battery grade specs 99.5% Li2CO3
1. LU7 ASX Announcement 30 Sept 24 – “Strong Preliminary Feasibility for Becancour Lithium Refinery”
THE LITHIUM REFINERY
PROJECT ADVANCEMENTS
• Application 22.5 MW electricity, Hydro Quebec
• Environmental survey – no showstoppers
• Co-operation with W8banaki First Nation
• Previous farm land
• Permitting should be straight forward
THE LITHIUM REFINERY
BECANCOUR LITHIUM REFINERY
CONSERVATIVE
PRICE FORECAST
SC6 US$1,170/t LC $20,970/t
1. LU7 ASX Announcement 30 Sept 24 – “Strong Preliminary Feasibility for Becancour Lithium Refinery”
BECANCOUR LITHIUM REFINERY
8%
NET PRESENT VALUE
US$ 779 MILLION
1. LU7 ASX Announcement 30 Sept 24 – “Strong Preliminary Feasibility for Becancour Lithium Refinery”
BECANCOUR LITHIUM REFINERY
IRR PAYBACK
23.5% 3.5 YEARS
1. LU7 ASX Announcement 30 Sept 24 – “Strong Preliminary Feasibility for Becancour Lithium Refinery”
BECANCOUR LITHIUM REFINERY
EBITDA
CAPEX
US$ 147M US$ 494M
Quebec Lithium Refinery Pre -Tax Cashflows
500,000
400,000
300,000
200,000
US$'000
100,000
-
(100,000)
(200,000)
(300,000)
(400,000)
(500,000)
(600,000)
Capex
Spodumene Costs
1. LU7 ASX Announcement 30 Sept 24 – “Strong Preliminary Feasibility for Becancour Lithium Refinery”
Processing Costs
Revenue
Net Cashflow
FUNDING STRATEGY
Project Ownership
• Sell 49% project to 1-2 strategic partners
• Target OEM with spodumene offtake
• Equity from sale injected to project
• Debt and Equity of 50/50
• Appointment of debt adviser
• Discussions with various banks
Partner 2, 25
Partner 1, 25
THE LITHIUM REFINERY
LU7 , 51
BECANCOUR LITHIUM REFINERY
BECANCOUR
NPV BREAKEVEN
SC6 US$780/t LC $14,000/t
1. LU7 ASX Announcement 30 Sept 24 – “Strong Preliminary Feasibility for Becancour Lithium Refinery”
BECANCOUR LITHIUM REFINERY
ALL UPSIDE – 25% PRICE INC
NPV US$1.24 Billion
EBITDA Sensitivity to Lithium Carbonate Price
600
EBITDA (US$ MILLIONS)
500
400
300
200
100
$14,000
$16,000
$18,000
$20,000
$22,000
1. LU7 ASX Announcement 30 Sept 24 – “Strong Preliminary Feasibility for Becancour Lithium Refinery”
$24,000 $26,000 $28,000 $30,000
LITHIUM CARBONATE PRICE / TONNE
$32,000
$34,000
$36,000
$38,000
$40,000
DFS AND OFFTAKE DISCUSSIONS
• Strategic Investors at Project Level
• Offtake Discussions with OEMs
• Complete full Definitive Feasibility Study
• Project Permitting
• Funding Plan Underway
THE LITHIUM REFINERY
LITHIUM DREAM TEAM
Proven Lithium Track Record
PROVEN TECHNOLOGY
Derisking Lithium Conversion Technology
BÉCANCOUR LITHIUM REFINERY
Competitive & Closing the Conversion Gap
INVESTOR HIGHLIGHTS
CAUTIONARY STATEMENTS
Information Required by Listing Rules
The Becancour Lithium Refinery Preliminary Feasibility Study (PFS) does not rely upon estimated ore reserves / and or mineral resources. The spodumene concentrate feedstock for the proposed refinery has been assumed to have been purchased directly from
spodumene miners currently producing spodumene concentrates or marketing agents or traders currently purchasing spodumene concentrate and selling to the downstream processors. Accordingly, the JORC Code is not relevant to this study nor are Listing Rules
5.16 and 5.17 to the extent to which they relate to matters concerning JORC.
Forward Looking Statements
This release contains “forward-looking information” that is based on the Company’s expectations, estimates and projections as of the date on which the statements were made. This forward-looking information includes, among other things, statements with respect to
studies, the Company’s business strategy, plan, development, objectives, performance, outlook, growth, cash flow, projections, targets and expectations. Generally, this forward looking information can be identified by the use of forward-looking terminology such as
‘outlook’, ‘anticipate’, ‘project’, ‘target’, ‘likely’,’ believe’, ’estimate’, ‘expect’, ’intend’, ’may’, ’would’, ’could’, ’should’, ’scheduled’, ’will’, ’plan’, ’forecast’, ’evolve’ and similar expressions. Persons reading this news release are cautioned that such statements are only
predictions, and that the Company’s actual future results or performance may be materially different. Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the Company’s actual results, level of activity,
performance or achievements to be materially different from those expressed or implied by such forward-looking information. Forward-looking information is developed based on assumptions about such risks, uncertainties and other factors set out herein, including but
not limited to general business, economic, competitive, political and social uncertainties; the actual results of current development activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; future prices of metals;
failure of plant, equipment or processes to operate as anticipated; accident, labour disputes and other risks of the chemical industry; and delays in obtaining governmental approvals or financing or in the completion of development or construction activities. This list is
not exhaustive of the factors that may affect our forward-looking information. These and other factors should be considered carefully, and readers should not place undue reliance on such forward-looking information. Neither the Company, nor any other person, gives
any representation, warranty, assurance or guarantee that the occurrence of the events expressed or implied in any forward-looking statement will actually occur. Except as required by law, and only to the extent so required, none of the Company, its subsidiaries or its
or their directors, officers, employees, advisors or agents or any other person shall in any way be liable to any person or body for any loss, claim, demand, damages, costs or expenses of whatever nature arising in any way out of, or in connection with, the information
contained in this document. The Company disclaims any intent or obligations to or revise any forward-looking statements whether as a result of new information, estimates, or options, future events or results or otherwise, unless required to do so by law.
Cautionary Statement
The PFS is based on the material assumptions outlined including that it has been completed in accordance with AACE Principles to a Class 5 level with a nominal level of accuracy of ± 35%, that the financial forecasts rely upon the purchase of third party spodumene
concentrate as the feedstock for the plant. The PFS referred to in this announcement has been undertaken to assess the potential technical feasibility and economic viability of constructing and operating facilities capable of producing battery grade lithium carbonate for
use in lithium-ion batteries from those units of operations and provide baseline financial metrics to consider future investment decisions.
The Preliminary Feasibility Study (PFS) is based on the material assumptions. These include assumptions about the availability of funding. While Lithium Universe considers all of the material assumptions to be based on reasonable grounds, there is no certainty that
they will prove to be correct or that the range of outcomes indicated by the PFS will be achieved. To achieve the range of outcomes indicated in the PFS, funding of in the order of US$500 million will likely be required. Investors should note that there is no certainty that
Lithium Universe will be able to raise that amount of funding when needed. It is also likely that such funding may only be available on terms that may be dilutive to or otherwise affect the value of Lithium Universe’s existing shares. It is also possible that Lithium
Universe could pursue other ‘value realisation’ strategies such as a sale, partial sale or joint venture of the project. If it does, this could materially reduce the Company’s proportionate ownership of the project. Given the uncertainties involved, investors should not make
any investment decisions based solely on the results of the PFS.