Latest Company Presentation
Released
Released
Announcement PDF
LITHIUM REFINERY
BECANCOUR QUEBEC
PRECIOUS METALS EXTRACTION
RECYCLING DIVISION
LITHIUM REFINERY
DIVISION
Extraction of Silver from PV Waste Closing the Lithium Conversion Gap in Nth America
MINE SUPPLY
+40 companies Quebec
>500Mt +1% Li2O resource
Canada, Brazil, Africa
DEMAND
+20 battery manufacturers
1,000GW by 2028
850,000t LCE per year
No current lithium converters
Only 100 Ktpa planned
No lithium refining experience
LITHIUM REFINERY
BÉCANCOUR QUEBEC (DFS)
18,270 tpa Battery Grade Lithium Carbonate Refinery
2ND LITHIUM REFINERY
BROWNSVILLE TEXAS (SCOPING)
18,270 tpa Battery Grade Lithium Carbonate Refinery
THE LITHIUM GAP
• Many failures, technical difficulties
• Existing Lithium producers
• Relatively young industry
• Complex chemical business
Proven Technology
PROBLEMS FILLING THE GAP
Experienced Operators
CHINA LITHIUM CONVERSION
Where did the technology come from?
• China dominates lithium spod conversion (>96% globally)
• Replication outside China has failed (Tianqi & Albermarle)
• China banned its export of conversion technology
• Original technology brought to China by Australian Company
• Galaxy built the Jiangsu 17 ktpa Li C plant in 2011
• Largest plant at the time was 5 ktpa
• Became the benchmark and revolutionized China’s Li industry
• LU7 (ex Galaxy) can bring this technology to Canada/USA
LU7 LITHIUM STRATEGY
PATENT I/P RIGHTS
• Chemistry comes from 1950’s
• Process is now essentially OPEN Technology
• Most plants use the basic process
• Difference is the intimate operating knowledge
• Steers the design phase – mistakes at design - disaster
• LU7 & Hatch have collective know how
• Replicate exactly the final Jiangsu Plant
• 3 LU7 Patents pending – process improvements
LU7 LITHIUM STRATEGY
DESIGN MISTAKES - MASSIVE SCALING ISSUES
LU7 LITHIUM STRATEGY
CANADIAN ATTEMPTS
THE COMPETITION
• Shutdown 2015
• Spent circa CAD 250m
• Produced 109 t LC
North American Lithium
• DFS completed 2018
• Spent CAD 411 m
• Failed to start up 2019
Nemaska Lithium
• In construction
• 32,000 tpa LiOH
• Start Prod 2028
Rio Nemaska 2
X X
AUSTRALIAN ATTEMPTS
• 8 Years so far
• Capital Cost Blowout
• > A$1 billion
• Care and Maintenence
Tianqi Kwinana LiOH
THE COMPETITION
• 5 years so far
• Still <20% of design rate
• Shut trains 2,3,4
• Write down US$1.5 billion
Albemarle Kemerton LiOH
• Unproven Technology
• 1995 Greenbushes 5Ktpa
• Failed due to scaling
• Tesla and Keliber
Alkaline Pressure Leach
• 50,000 tpa LiOH
• Wesframers:SQM
• Estimate US$1.2b
• Ramping Up
Covalent Kwinana LiOH
X X ?
AUSTRALIAN ATTEMPTS
• 8 Years so far
• Capital Cost Blowout
• > A$1 billion
• Care and Maintenence
Tianqi Kwinana LiOH
THE COMPETITION
• 5 years so far
• Still <20% of design rate
• Shut trains 2,3,4
• Write down US$1.5 billion
Albemarle Kemerton LiOH
• Unproven Technology
• 1995 Greenbushes 5Ktpa
• Failed due to scaling
• Tesla and Keliber
Alkaline Pressure Leach
• 50,000 tpa LiOH
• Wesframers:SQM
• Estimate US$3b
• Ramping Up
Covalent Kwinana LiOH
X X ?
CHINA TECHNOLOGY EXPORT BANS
THE COMPETITION
Roger Pover
Head of Processing
Ex Galaxy Plant Manager
Terry Stark
Head of Mining
Ex Galaxy GM Operations
John Loxton
Head of Li Refinery
Ex Hatch Li Carb Plant
John Sobolewski
Chief Financial Officer
Ex Galaxy CFO & Co Sec
DREAM TEAM TO BRING TECHNOLOGY
1 May 2010 6 Dec 2011
(19 months)
Start of
Construction
Project
Completion
Ground
Breaking
21 Feb 2010
DREAM TEAM TRACK RECORD
6 May 2012
(6 months Commissioning)
2 Years to Commercial Production
• Capital Cost – US$120 m
• At design rate 20,000 tpa
• Highest quality LC worldwide
Jiangsu Li Carbonate Plant
Jiangsu Lithium Carbonate Plant
CLOSING THE LITHIUM CONVERSION GAP
”Copy and Paste Modular Lithium
Refineries that Work”
REFINERY
BÉCANCOUR LITHIUM
CLOSING THE LITHIUM GAP
• Replicate the success at Jiangsu
• 18,270 tpa green BG lithium carbonate plant
• Bécancour, Quebec’s Battery Hub
• Same flow sheet, same equipment, same suppliers
WHY BECANCOUR, QUEBEC?
THE LITHIUM REFINERY
• Proximity to Nth American EV battery supply chain
• Access to low-cost hydroelectric power
• Abundant local spodumene resources
• Established industrial park/chemical infrastructure
• Strong government incentives from Quebec
• Deep water port and shipping routes
QUEBEC LITHIUM CONVERSION
Why can you compete with China?
• Access to Cheap Green Power
• Nearby feedstock - Canada, Brazil and Africa
• Decrease in transport costs of spodumene
• End market North America
• US$3,900/t vs China of US$3,500/t LC
LU7 LITHIUM STRATEGY
Bécancour
Lithium
Refinery
THE LITHIUM REFINERY
GOOD LOCATION
30,000 Spodumene Shipments
Calciner
Cooler
Ion
Exchange
Spodumene
Sodium
Carbonate
Li2CO3
Precipitation
Sulphating
Kiln
Sulphuric
Acid
Process Liquor
Hydrated
Lime
Mg
Precipitation
Alpha
Spodumene
Beta
Spodumene
Leaching
Tank
Sodium Sulphate
Crystalliser
Ball Milling
Filter
Dryer
Sodium
Sulphate
Product
o/flow
Centrifuge
Hydrated
Lime
Alumina
Silicate
Ca
Precipitation
Sulphuric
Acid
Wash
Water
Natural Gas
Water
Polishing
Filter
Dryer
Battery Grade
Lithium Carbonate
Product
Microniser
Cooler
PolishingFi
lter
Battery
Grade
Centrifuge
Repulp
CO2
Steam
Polishing
Filter
CO2
LiC
Bicarbonate
Digestor
LC Crystalliser
Li Carb
Slurry Tank
LITHIUM REFINERY FLOW SHEET
PURIFICATION
PLANT
BECANCOUR LITHIUM REFINERY
THE LITHIUM REFINERY
BÉCANCOUR LITHIUM DFS
CLOSING THE LITHIUM GAP
• SC6 US$1,170/t LC $20,970/t
• Capex US$549 million
• NPV8 US$718 million
• IRR 21% Payback 3.9 years
• EBITDA US$148 million
CURRENT LITHIUM PRICE RECOVERY
CLOSING THE LITHIUM GAP
Prices have
increased
2.5x since
2025
DFS
CNY/t
Lithium Carbonate Battery Grade – China (CNY/t, USD/t)
Trading Economics
USD/t
23,750
11,100
19,400
16,600
13,900
22,200
8,300
Bécancour DFS LT Forecast Price Assumption
Current Spot Price
Price During DFS Work
PROJECT ADVANCEMENTS
• Application 22.5 MW electricity, Hydro Quebec
• Environmental survey – no showstoppers
• Co-operation with W8banaki First Nation
• Previous farm land
• Permitting should be straight forward
THE LITHIUM REFINERY
PROJECT MOU’S
• Exclusive supply alumina silicate to Lafarge
• Canada’s largest cement producer
• Supply of sodium sulphate to Africa
• MOU with Polytechnique for training
THE LITHIUM REFINERY
STRATEGIC BINDING FEEDSTOCK
SUPPLY FROM NIGERIA
• Strategic 10-year (rolling 5) spodumene supply
• Binding Offtake Agreement - Norah Mining Ltd
• Supply of 80,000 tpa spod con 6.0% Li₂O equivalent
• Norah concentrator is in construction
• LU7 will trade to third parties
• LU7 to benefit from an 7.5% partner price discount
NIGERIA
QUEBEC
FUNDING STRATEGY
THE LITHIUM REFINERY
• Strategic partners to own 49%
• Target OEM with final LC offtake
• Equity from sale injected to project
• Debt and Equity of 50/50
• LU7 remains as operator
LU7 51%
Partner 1,
24%
Partner 2,
25%
Project Ownership
LU7 PROPOSED LITHIUM REFINERY
PORT OF BROWNSVILLE TEXAS
TESLA LITHIUM HYDROXIDE REFINERY
CORPUS CHRISTI
LU7 PROPOSED LITHIUM REFINERY
PORT OF BROWNSVILLE TEXAS
Conventional Sulfuric Acid
Proven Process
WHY PORT OF BROWNSVILLE?
THE LITHIUM REFINERY
• Established Chemicals & Energy Infrastructure
• Lower-Cost Workforce -25%
• Pro-Business Environment
• Binational logistics hub (US–Mexico)
• Cheaper Supplies and Consumables from Mexico
• Foreign Trade Zone & Tax advantages
• Deep Water Port for Spodumene Imports
• IRA Incentives & Policy Support
LU7 Lithium Refinery Site
PORT OF BROWNSVILLE, TEXAS
• 35 Acres
• Power lines to Site
• Gas supply to site
• Established roadways
• Close to Port Berth
• 30,000 t Spodumene Shipments
LU7 PROPOSED SITE
BROWNSVILLE STRATEGY
THE LITHIUM REFINERY
• Finalize site selection
• Option to lease application for site
• Preliminary environmental assessment
• Suppliers, Utilities and Local Government
• Complete Scoping Feasibility Study
SILVER EXTRACTION PV SOLAR
CELL RECYCLING TECHNOLOGY
• Globally 60-78mt accumulated waste PV by 2050
• Australia 1 Mt end-of-life PV worth $1B by 2045
• Only 15% of PV cells today are recycled
• Rest ends up in LAND FILL
• Valuable silicon, silver, gallium & indium
THE PROBLEM TODAY
15%
• About 20 grams of Silver – each PV panel
• Electrical contacts – flow of electricity
• “Fingers" (thin lines) and "busbars" (thicker lines)
• >A$67 of Silver in every panel
SCRAPING VALUABLE SILVER
PV SOLAR CELL
Frame
Front Glass
Encapsulant (EVA)
Solar Cell
Encapsulant (EVA)
Back Sheet
• Record demand 680 million ounces in
2024
• Industrial demand surged by 7%
• Growth is expected to carry beyond 2025
• Photovoltaics and AI as the fastest-
growing drivers
SILVER MARKET
2015 2016 2017 2019
2018 2020 2021
Photovoltaics
Other
Source: Metals Focus, Wisdom Tree, January 2025 Electrical
Photovoltaics (Share Right)
2023
2022 2024 2025
Brazing Alloys & solders
700
600
500
400
300
200
100
0
Million
ounces
Photovoltaic
chare
0%
5%
10%
15%
20%
25%
30%
35%
Other Electrical
• Demand has started to outstrip supply
• Market deficit 118 mil oz
• Significant silver price increase
• US$15/oz in 2018 to US$73/oz 2025
• 380% increase since 2018
• Silver recovery from recycling will
become increasing important
SILVER PRICE RESPONSES
• 3.45 million tonnes in 2025
• 4.49 million tonnes by 2030 growing at
CAGR 5.41% pa
• Solar panels projected highest growth
rate of 7% til 2029
• Silicon dominance in semi-conductor
material in solar cells
SILICON MARKET
3.45 million
4.49 million
2025 2030
Source: Mordo Intelligence
Silicon Metal Market
Market Size in Million Tonnes
CAGR 5.41% Metal Market
• Shredding and grinding PV cells
• EVA (binder) is removed by high temperatures
• EVA removed by toxic acid chemicals
• Low value glass applications – insulation, buildings
• Low silicon and silver recovery
• Due to complexity, high cost, poor yields
TRADITIONAL PV RECYCLING
Material
Extraction
Mechanical
Breakdown
Initial
Dismantling
• Microwave Joule Heating Technology (MJHT)
• Jet Electrochemical Silver Extraction (JESE)
• Layer by layer separation
• Preserves materials in cleaner separable form
• High value products instead of waste
LU7 PV RECYCLING TECHNOLOGY
• Microwave Joule Heating Technology (MJHT)
• Utilizes Microwave Technology
• Selectively heat and delaminates PV cells
• Glass panel instead of crushed glass
• Silicon sheet instead of crushed powder
• High value products instead of waste
MICROWAVE DELAMINATION
Back Sheet or
Glass Plate
Solar Cells
Glass Plate
Microwave Radiation
EVA
Sheets
Microwave Delamination
Front Glass
EVA
EVA
Solar Cell
Backing Plate
MJHT SELECTIVE DELAMINATION
Back Sheet or
Glass Plate
Solar Cells
Glass Plate
Microwave Radiation
EVA
Sheets
Front Glass
EVA
EVA
Solar Cell
Backsheet
Front Glass Delamination
Front Glass
EVA
EVA
Solar Cell
Backsheet
Back Sheet Delamination
Microwave Delamination
Front Glass
EVA
EVA
Solar Cell
Backing Plate
Back Sheet or
Glass Plate
Solar Cells
Glass Plate
Microwave Radiation
EVA
Sheets
Front Glass
EVA
EVA
Solar Cell
Backsheet
Front Glass Delamination
Front Glass
EVA
EVA
Solar Cell
Backsheet
Back Sheet Delamination
Microwave Delamination
Front Glass
EVA
EVA
Solar Cell
Backing Plate
Silicon Wafer
Clean Glass Sheet to be Reused
Silicon Wafer for Silver Extraction &
Silicon Recycling
Front Glass
Silver
(High Purity)
Silicon
(High Purity)
• Jet Electrochemical Silver Extraction (JESE)
• Uses electrochemical low-voltage jet to selectively
extract silver
• Silver dissolves into dilute nitric acid electrolyte
• Leaves aluminum and other impurities behind
• High purity silver metal recovered from electrolyte via
electrochemical deposition
SILVER EXTRACTION
Anode
Cathode
Cathode
Anode
Silver
Deposition
Silver
Extraction
SILVER EXTRACTION SILVER DEPOSITION
High Purity
Silver
Solar Cell
• Silver removal leaves impurities – adjust voltage
• Silver deposited at the same process
• Recoveries better than 95%
• 96% purity of silver deposited
• Dopants can be cleaned off silicon wafer
• Silicon wafer high purity for direct reuse
• All high value separate products
ACHIEVEMENTS
Deframe Delamination
Solar Panel
Delamination
EVA Removal
Silver Electro
Jet Removal
Al Junction
Box
Copper
Wires
Reusable
Glass
Sheet
High Purity
Silicon Feed
Solid Silver
(High Purity)
Macquarie MJHT
Technology
Macquarie JESE
Technology
Silver Electro
Deposition
Silicon
Wafer
EVA
Silicon Wafer
RECYCLING TECHNOLOGY
• Negates the fine unusable powder – conventional recycling
• Layer by layer separation
• Preserves material in cleaner separable form
• Low energy heating – Microwave Technology
• Glass sheet can be reused to make PV cells again
• Glass, Silver, Silicon – all at high purity
• Higher recoveries, less waste
• 3-4 times Value Recovery
ADVANTAGES OF TECHNOLOGY
LITHIUM REFINERY
BECANCOUR QUEBEC
PRECIOUS METALS EXTRACTION
RECYCLING DIVISION
LITHIUM REFINERY
DIVISION
Extraction of Silver from PV Waste Closing the Lithium Conversion Gap in Nth America
CAUTIONARY STATEMENTS
Information Required by Listing Rules
The Becancour Lithium Refinery Definitive Feasibility Study (PFS) does not rely upon estimated ore reserves / and or mineral resources. The spodumene concentrate feedstock for the proposed refinery has been assumed to have been purchased directly from
spodumene miners currently producing spodumene concentrates or marketing agents or traders currently purchasing spodumene concentrate and selling to the downstream processors. Accordingly, the JORC Code is not relevant to this study nor are Listing Rules
5.16 and 5.17 to the extent to which they relate to matters concerning JORC.
Forward Looking Statements
This release contains “forward-looking information” that is based on the Company’s expectations, estimates and projections as of the date on which the statements were made. This forward-looking information includes, among other things, statements with respect to
studies, the Company’s business strategy, plan, development, objectives, performance, outlook, growth, cash flow, projections, targets and expectations. Generally, this forward looking information can be identified by the use of forward-looking terminology such as
‘outlook’, ‘anticipate’, ‘project’, ‘target’, ‘likely’,’ believe’, ’estimate’, ‘expect’, ’intend’, ’may’, ’would’, ’could’, ’should’, ’scheduled’, ’will’, ’plan’, ’forecast’, ’evolve’ and similar expressions. Persons reading this news release are cautioned that such statements are only
predictions, and that the Company’s actual future results or performance may be materially different. Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the Company’s actual results, level of activity,
performance or achievements to be materially different from those expressed or implied by such forward-looking information. Forward-looking information is developed based on assumptions about such risks, uncertainties and other factors set out herein, including but
not limited to general business, economic, competitive, political and social uncertainties; the actual results of current development activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; future prices of metals;
failure of plant, equipment or processes to operate as anticipated; accident, labour disputes and other risks of the chemical industry; and delays in obtaining governmental approvals or financing or in the completion of development or construction activities. This list is
not exhaustive of the factors that may affect our forward-looking information. These and other factors should be considered carefully, and readers should not place undue reliance on such forward-looking information. Neither the Company, nor any other person, gives
any representation, warranty, assurance or guarantee that the occurrence of the events expressed or implied in any forward-looking statement will actually occur. Except as required by law, and only to the extent so required, none of the Company, its subsidiaries or its
or their directors, officers, employees, advisors or agents or any other person shall in any way be liable to any person or body for any loss, claim, demand, damages, costs or expenses of whatever nature arising in any way out of, or in connection with, the information
contained in this document. The Company disclaims any intent or obligations to or revise any forward-looking statements whether as a result of new information, estimates, or options, future events or results or otherwise, unless required to do so by law.
Cautionary Statement
The DFS is based on the material assumptions outlined including that it has been completed in accordance with AACE Principles to a Class 5 level with a nominal level of accuracy of ± 35%, that the financial forecasts rely upon the purchase of third party spodumene
concentrate as the feedstock for the plant. The DFS referred to in this announcement has been undertaken to assess the potential technical feasibility and economic viability of constructing and operating facilities capable of producing battery grade lithium carbonate for
use in lithium-ion batteries from those units of operations and provide baseline financial metrics to consider future investment decisions.
The Definitive Feasibility Study (PFS) is based on the material assumptions. These include assumptions about the availability of funding. While Lithium Universe considers all of the material assumptions to be based on reasonable grounds, there is no certainty that
they will prove to be correct or that the range of outcomes indicated by the DFS will be achieved. To achieve the range of outcomes indicated in the DFS, funding of in the order of US$600 million will likely be required. Investors should note that there is no certainty that
Lithium Universe will be able to raise that amount of funding when needed. It is also likely that such funding may only be available on terms that may be dilutive to or otherwise affect the value of Lithium Universe’s existing shares. It is also possible that Lithium
Universe could pursue other ‘value realisation’ strategies such as a sale, partial sale or joint venture of the project. If it does, this could materially reduce the Company’s proportionate ownership of the project. Given the uncertainties involved, investors should not make
any investment decisions based solely on the results of the DFS
Share your feedback
Discover